top of page

Ashton Canal towpath

Writer: kbiukltdkbiukltd

The Canal & River Trust (CRT) have a continual programme of upgrading canal towpaths around the country. They had used Flexipave on similar projects in the Midlands, and they needed to overcome the problem of waterlogged paths which was restricting public use on this site.


Comments from Rob Jowitt of the CRT:


“From a practical aspect, being able to lay Flexipave surfacing by hand meant it was suitable for use directly behind heritage coping stones and it could be carefully laid around the natural shapes of the stones. This avoided the need to overlay any surfacing material on top of the coping stones, allowing for a neat and tidy finish to the towpath.”


Total area size – 1750m2 x Flexipave at 35mm depth, Stone Age Bronze colour.


Completed 2016


 
 

Comments


Unit 8 NEXUS

Capitol Court

Dodworth

Barnsley

South Yorkshire 

S75 3UD

T: 01422 242880

KBI Strap Logo Cropped Tight.png
  • LinkedIn
  • Twitter Social Icon
  • YouTube Social  Icon

Registered in the United Kingdom No. 07439087         VAT No. 104174846

All content copyright KB Industries UK Ltd 2022

bottom of page