top of page

Case Studies 

Click on a case study image to launch the PDF version.

This can also be downloaded and saved to your device.

Bramhall Park Case Study Thumbnail _1.jpg

Bramhall Park

KBI were appointed to transform Bramhall Park with Flexipave and Flexistone.

 

KBI installed 1000m2 of Flexistone in a huge install surrounding the hall terraces. The installation yielded transformative results, exceeding both functionality and aesthetics.

 

Flexipave was also chosen in the woodland areas of Bramhall Park to improve accessibility throughout the park

​

​

CS16 Locke Park Cafe.jpg

Locke Park

KBI were appointed to refurbish the Locke Park cafe area by Barnsley Council's park services.

 

The primary objective was to enhance cleanliness and accessibility, aligning with the council's vision for the park's improvement.

 

Flexipave was chosen due to its porosity and the material being extremely eco-friendly. The carbon offset acheived by Flexipave was also a key element in the selection process.

​

​

CS19 Water of Leith.jpg

Water of Leith

KBI installed over 18,000m2 of Flexipave in a major project in 2023. 

​

This was part of a wider scheme to encourage more people to cycle in Scotland.

The Water of Leith Walkway is a pathway that opened in 2002 as a millennium project and was worn out in places.

 

The pathway that runs for 7km was no longer accessible for wheelchair and pushchair users. There was an attempt to refurbish the pathway with an alternative material which failed as a ‘bound’ product.

​

Flexipave provided an improved surface in a scheme which received excellent feedback

Dunford Bridge Case Study Thumbnail.jpg

Dunford Bridge

In 2022, KBI were tasked with the job in rejuvenating  the Trans Pennine Trail at Dunford Bridge. Through the use of Flexipave, the project encompassed the resurfacing of the trail, car park, and surrounding access paths.  

 

The purpose was to enhance the visual appeal of the location but also prioritise improved drainage and reduced maintenance, aligning with a larger scheme to relocate overhead electrical pylons into underground tunnels within the stunning landscape of the Peak District.

​

 Shallcross Incline Case Study Thumbnail.jpg

Shallcross Incline 

The Shallcross Incline greenway in Whaley Bridge was a former railway before it turned into a greenway. The existing surface was severely damaged by floods in 2019.

 

Due to its steep incline, flooding has been a major issue, this was where Flexipave was recommended. 

​

​

CS18 Hadrians Wall .jpg

Hadrians Wall 

Working for English Heritage, KBI installed 207sqm of Flexipave that was completed in two phases. The first phase was completed in November 2022, with the second phase going ahead in March 2023.

​

The Flexipave surface makes the tourist site more accessible for walkers and visitors and fits in very well with the grass around it.

 

​

CS22 Swinton Greenway.jpg

Swinton Greenway

Working closely with Casey Construction and Salford City

Council, KBI installed 17,447 sqm of Flexipave at the Swinton Greenway trail at Salford in Manchester.

 

The project was part of Salford City Council’s mission to improve cycling and walking routes around the area.

 

​

Edinburgh Zoo Dinosaur Trail Thumbnail.jpg

Edinburgh Zoo​

Set in 82 acres of glorious sloping parkland, Edinburgh Zoo has been a world-famous feature of the city for over 100 hundred years. In Autumn 2021, KBI UK was invited to look at creating new accessible pathways for a new Dinosaur Trail.

​

Following detailed consultation, the phased installations began in early 2022 using our HD1500 & HD2000 Flexipave system in Stone Age Bronze finish.

 

​​

CS11 Legoland Mythica.jpg

Legoland Mythica

Opened in Summer 2021, MYTHICA at LEGOLAND Windsor is a brand-new themed area that incorporates three new rides. Having previously worked on the park’s Haunted House project in 2020, KBI was contacted by B&E Services to explore design options for the new MYTHICA area. Starting with a basic brief, the KBI team was introduced to the LEGOLAND architects, who explained their vision of a colour coordinated porous surface that integrated some specific matching elements.

 

​

​

CS23 Murrayfield Golf Club .jpg

Murrayfield GC

Murrayfield Golf Club is an icon within the city of Edinburgh. With unparalleled views over the beautiful Scottish capital, the course offers everything that golfers love about the game.

 

In spring 2021, KBI UK was invited to look at the resurfacing of numerous sections of the course, including the pathways linking the clubhouse to the 1st tee. Following detailed consultation, the phased installations began in April 2021 using our HD1500 & HD2000 Flexipave system in Trent Pea Finish.

CS15 Tree Surrounds.jpg

Tree Surrounds

Flexipave  site of significant importance for the city. Attracting thousands of visitors each year, the estate is managed by Sean Morrison of Savills Management Services. With a new tree planting programme scheduled for 2014, they needed a durable surfacing product that would encourage tree growth by being both porous and flexible, as well as having an attractive appearance.

 

​​

CS20 Cycle Routes.jpg

Cycle Routes

Flexipave is a proven solution for cycle routes. Our company has installed many miles of our unique material across all parts of the UK, receiving praise from users for the friendly way that the material feels whilst riding.

 

Many of the cycle routes that KBI has resurfaced were previously only accessible in good weather. The use of Flexipave has transformed these routes in to year round facilities.

​​

CS17 Folly Lane Trans Pennine.jpg

Folly Lane TPT

The Folly Lane stretch of the Trans Pennine Trail was an unused bridleway that formed part of the trail that runs through South Yorkshire. The steep inclines and surface erosion had left the path unsuitable for horses and walkers due to the unstable nature of the ground.

​

​​

CS10 Vita York .jpg

Vita York

Vita York was a hugely ambitious project to create state-of-the-art student living accommodation in this historic Yorkshire city. The project involved new-build construction that needed to integrate sympathetically with a Grade II listed former convent building.

The Flexistone completely transformed the look of the student village. 

 

​​

CS21 National Libary of Wales.jpg

National Library of Wales

The National Library of Wales, Aberystwyth, is the national legal deposit library of Wales and is one of the Welsh Government sponsored bodies.

It is the biggest library in Wales, holding over 6.5 million books and periodicals, and the largest collections of archives, portraits, maps and photographic images in Wales.

 

Work to resurface the public access around the building using Flexipave began in Spring 2021.  

​​

CS07 Newstead Village.jpg

Newstead Village

Working with Bullock construction, KBI UK helped to regenerate 51 properties owned by Gedling Homes in Newstead Village, Nottinghamshire.

 

KBI Flexipave was installed in both front and rear gardens, helping to revitalise the look of the

neighbourhood and transform the quality of the properties.

 

​

CS01 Albert Dock.jpg

Albert Dock, Liverpool

KBI UK installed Flexipave tree surrounds at Liverpool’s Royal Albert Dock, providing a durable, porous and flexible solution that supports healthy tree growth. Using 243 recycled tyres, the project delivered a sustainable finish that complements the historic surroundings, with further works completed in 2025.

CS02 All Saints Church .jpg

All Saints Church

KBI UK installed 100m² of Flexipave pathways at All Saints Church in Shiptonthorpe, improving safety, wheelchair accessibility and drainage. The durable, slip-resistant surface complements the historic surroundings while providing a sustainable solution, recycling 267 vehicle tyres and saving 5,874kg of CO₂ emissions.

CS03 Canal Towpaths .jpg

Canal Towpaths

KBI UK installed Flexipave across sections of the UK’s canal towpath network, improving accessibility, drainage and durability while preserving their historic character. Made using recycled tyres, the sustainable surface reduces waterlogging and erosion, with materials transported and mixed on narrowboats to minimise environmental disruption.

CS04 CBeebies Land Hotel .jpg

CBeebies Land Hotel

The entrance to CBeebies Land Hotel at Alton Towers Resort was transformed using Flexistone and bespoke coloured surfacing, creating a vibrant, playful and welcoming finish. The durable, low-maintenance and permeable surface features colourful designs that complement the hotel's theme while improving drainage and providing a long-lasting decorative solution.

CS26 Nailsworth Trail.jpg

Nailsworth Trail

Flexipave installation works were successfully completed at Nailsworth, providing a durable, flexible and permeable surface. The installation enhances the appearance of the area while offering excellent drainage, reduced surface cracking and long-term performance.

CS13 Gateway 36.jpg

Gateway 36

Flexipave installation works were successfully carried out at Gateway 36, delivering a durable, flexible and hard-wearing surface. The finished installation provides excellent drainage, improved surface appearance and long-lasting performance.

Unit 8 NEXUS

Capitol Court

Dodworth

Barnsley

South Yorkshire 

S75 3UD

​

T: 01422 242880

KBI Strap Logo Cropped Tight.png
  • Instagram
  • Facebook
  • LinkedIn

Registered in the United Kingdom No. 07439087         VAT No. 104174846

All content copyright KB Industries UK Ltd 2022

bottom of page